[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

Re: Searching for concensus on Pub Control (Re: Consensus call: PacePubControl)




Joe Gregorio wrote:


I'd like to know how people feel about the following statements. Feel
free to either +/- 1 them or, for example, say that the MUST needs to
be a SHOULD, or MAY. I've worded these all strongly to hoepfully prod
more people into responding :)

When I say Control Information, let's just assume that's restricted to
'draft=yes/no' for now.

1. Control information MUST be sent with the initial POST to create an entry.
   (otherwise creating a draft is a two step process.)



+1

2. Control information MUST be sent with the initial POST to create a
non-entry member.



+1

3. Non-entry collections MUST support control data.



+1

3. Control information MUST be able to be set separately from updating
an entry via PUT. (because the overhead of PUTing the complete entry is too much overhead)




+1

4. Control information MUST be extensible.



+1

5. Control information MUST be in an XML document.



+1

6. Control information MUST be contained inside the entry document.



+0

- James