[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]

RE: Recurring Anniversary Instances?



Frank,
 
I don't think your short-hand suggestion would be the right way to interpret it.  Either it is an error case or you can indeed have DATE occurrences in a DATE-TIME event (and vice-versa).
 
We do need a concensus on this.  I have already added the capability to my app and I know others have it as well (MS Outlook 97 does).  If it is an error state, I will remove it, but we need to decide.
 
I agree that this would be a wierd type of event, but the spec doesn't specifically disallow it and I don't think we should eliminate the option to provide that functionality.
 
-Dan
Frank wrote:
>No, this is an error UNLESS the semantics are that when this occurs, it is a short-hand for >"take the time portion of the date/time" from the original DTSTART and DTEND. This makes >sense to me. For example, define a -T080000Z to -T090000Z meeting (a soiree for us >US-Eastern time zone folks ;-) ) event that is augmented with a RDATE property that >specifies 5 other dates. The interpretation is that these 5 other occurrences are at the >same start/end as the first occurrence.
>
>Other wise, there appears to be a value type mismatching here also introduces this hybrid >event that is both a traditional appointment and a day-long event. Too weird.